Changes for this week:
  1. Tiles have been installed in the kitchen and the flooring is complete.
  2. Vinyl flooring has been installed in the bathroom & laundry room floor.
  3. Bathroom cabinets now have the counter tops installed. Faucets are still missing.
  4. Handrails have been installed for the stairs.
  5. A/C ducts and vents have been covered.
  6. Door have the knobs and locks installed.