- Tiles have been installed in the kitchen and the flooring is complete.
- Vinyl flooring has been installed in the bathroom & laundry room floor.
- Bathroom cabinets now have the counter tops installed. Faucets are still missing.
- Handrails have been installed for the stairs.
- A/C ducts and vents have been covered.
- Door have the knobs and locks installed.

















No comments:
Post a Comment