Progress update.... July 22nd

Lot more progress in the construction this week. All of the wooden frame of the house seem to be completed. The exterior has been covered with wooden wall. The exterior is now being covered with a bug & mold resistant Styrofoam padding with metal chains (this is the white color seen in the picture).




The biggest change this week has been on the inside. The air duct has been laid and the hot & cold water pipes have been drawn. The plumbing, now just as bare pipes go to all the rooms & kitchen. Its only after seeing the red & blue tubes did I realize that the big black PVC pipes were actually sewage pipes & not for carrying water.




Other changes on the inside include glass panes on the windows & sliding door to the courtyard. The bathrooms in the bedrooms now have the basic bath fixtures. The master bedroom has the shower stall installed, and the guest bedroom has the bathtub put in place.